    A PI is not a contract — 12 traps hiding inside the Proforma Invoice

    "We signed their PI and the deposit is wired — we’re locked in, right?" — the most common US-importer misread. A PI does not even reliably prove a binding agreement in a PRC court.

    TL;DR
    • A PI (Proforma Invoice) is fundamentally a quote, not a contract. A real supply agreement has at least 6 core clause sets — most PIs cover about 1.5.
    • Typical traps: 100% advance payment, no AQL, no LD, no tooling ownership, no venue — when something breaks you have zero leverage.
    • Move all 12 into a bilingual master contract, and stamp the PI "subject to master agreement". That is when the factory is actually bound.

    01Why a PI is not a contract

    A PI is a formal quote from seller to buyer, used to open an L/C, clear customs, or trigger an internal AP wire. It is fundamentally a commercial document, not a legal one.

    Even with both chops on it, a PRC court frequently treats a PI as a letter of intent, because:

    • It is missing core contract elements (breach remedies, dispute resolution, venue).
    • Clauses are described far too loosely (e.g. quality "as per sample").
    • It does not specify what the supplier owes you when it breaches.

    So when the factory slips a month: you file with the PI, the judge asks "show me the contractual basis for your damages number" — the PI does not have one, and you collect nothing.

    02The 12 traps that hide inside a typical PI

    1. 100% T/T in advance: Money is gone, leverage is zero. Move to 30/70 or 30/40/30.
    2. "Delivery: approximately 30 days": "Approximately" = no liability. Replace with a hard ETD plus 0.30% / day LD.
    3. "Quality as per approved sample": The sample is gone, batch variation is normal. Use AQL 2.5 / 4.0 with ANSI Z1.4 sampling.
    4. No inspection right: Without it, the factory can refuse your team or a 3rd-party inspector at the gate.
    5. No remedy for non-conforming goods: Pick one and write it: full lot return, factory-borne rework, or proportional price reduction.
    6. No tooling ownership: Paying the tooling invoice does not equal owning the tool. Spell out physical ownership and 30-day release.
    7. No IP / NNN: Drawings, designs, and derivative improvements belong in a separate NNN — not buried in a PI.
    8. No LD: "Handled per law" in a PRC court = nothing. Write specific % and caps.
    9. No force majeure definition: Factories love "pandemic / power rationing / containers" as an excuse. The contract must define what does and does not count.
    10. No labeling / packaging liability: Wrong label = US Customs hold or IP claim. Whose loss it is must be written.
    11. No venue / arbitration: Missing this one effectively voids the rest. Use CIETAC + factory-local court (two-track).
    12. No language priority: Bilingual contracts must say "If English and Chinese diverge, ___ controls".

    03Do not delete the PI — make it an annex to the master contract

    "Can I just use the PI as the contract?" — No. Instead:

    • Keep the PI for bank, customs, and internal AP workflow.
    • Sign a separate bilingual Supply Agreement that covers all 12 traps.
    • Cross-reference: each PI says "This PI is order #N under master contract ___"; the master contract attaches the PIs as exhibits.

    Result: commercial workflow stays smooth, legal coverage is complete, and when something breaks you put the master contract — not the PI — on the table.

    04Quick check: how many traps are in your PI?

    We built a 17-point PI / contract self-check that runs in 5 minutes. Questions include:

    • Is final payment tied to passing inspection?
    • Is daily LD in the 0.30–0.50% band?
    • Is PRC venue / arbitration explicit?

    It returns the exact gaps you have to close to actually win in a PRC court. Run the 17-point check on the main page →

    Ready to put this into a contract?

    These clauses only bite when they sit inside a bilingual agreement a PRC court will actually enforce. We give you the 17-point risk self-check, the LD sweet-spot calculator, and the PI vulnerability scanner.

    Try the three tools on the main page

    FAQ

    Q1. The PI has the company chop and a director signature — that’s not a contract?+

    PRC courts judge contract formation by completeness, not by chop. A PI without LD, venue, and dispute clauses is regularly treated as a letter of intent, chop or no chop.

    Q2. Our orders are small — a full contract feels heavy. Alternatives?+

    Use a "framework contract + PI rolling orders" model: one bilingual framework agreement covers all common clauses; each PO is just a PI with SKU, qty, price, ETD that inherits the framework.

    Q3. The factory says they "never sign contracts, only PIs". What now?+

    "We never sign" is almost always sales-speak. Run the first PO on their PI, draft a bilingual framework in parallel, and sign before PO #2. If they refuse outright, that is a hard signal — walk.

    Q4. We already paid and the goods shipped. Can we still backfill a contract?+

    Yes, but with less leverage. (1) Land this lot. (2) Insist on a framework contract before the next PO. (3) Add "applies to all orders from the date of this agreement" so it covers forward volume.